SILVER GATE

ROUTINE WORK

WEEKLY WORK:

  1. Drain control Air Filters.

  2. Take Head Tank samples and send to Sta. B. Lab.

  3. Check water test stations.

  4. calorimeter.

/O^/^

:z^/,r^ ^-4^ ^-^cr y^ ^^ ^^^ ^

-/tC^ yff^^-^ z^**^ -?r V^ ^^TTo

s/r

SILVER GATE

ROUTINE WORK

MONTHLY WORK:

,3. Uake top load combustion checks on edl Boilers

(after 8 months boiler operation increase cheeks

to twice monthly).

A, Check control air reducer operation.

  1. Send city nater composite to Sta. U. Lab. ''

  2. Take Turbine Lub. Oil samples eind send to Sta. B. Lab.

  3. Check Sol-u-Brldge. -

  4. Check all alarms.-

  5. Turbine Test, ^Z

  6. CaloriBBter. ^


archive.org Volume Name: govuscourtsca9briefs2771

Volume: http://archive.org/stream/govuscourtsca9briefs2771

Document Link: http://archive.org/stream/govuscourtsca9briefs2771#page/n736/mode/1up

Top Keywords (auto-generated):

press, pslg, prehtr, control, draft, open, notches, inches, hr, temp, reg, oil, hgo, flow, work

Top Key Phrases (auto-generated):

pslg pslg, open inches, prehtr draft, inches open, control press, reg notches, silver gate, press pslg, press oil, valve press, trol press, ter control, routine work, op op, gate routine

Document Status: UGLY