v2771-737
.0. 2 (Jor.-inued)
SILVER GATE
ROUTINE WORK
WEEKLY WORK:
Drain control Air Filters.
Take Head Tank samples and send to Sta. B. Lab.
Check water test stations.
calorimeter.
/O^/^
:z^/,r^ ^-4^ ^-^cr y^ ^^ ^^^ ^
-/tC^ yff^^-^ z^**^ -?r V^ ^^TTo
s/r
SILVER GATE
ROUTINE WORK
MONTHLY WORK:
,3. Uake top load combustion checks on edl Boilers
(after 8 months boiler operation increase cheeks
to twice monthly).
A, Check control air reducer operation.
Send city nater composite to Sta. U. Lab. ''
Take Turbine Lub. Oil samples eind send to Sta. B. Lab.
Check Sol-u-Brldge. -
Check all alarms.-
Turbine Test, ^Z
CaloriBBter. ^
archive.org Volume Name: govuscourtsca9briefs2771
Volume: http://archive.org/stream/govuscourtsca9briefs2771
Document Link: http://archive.org/stream/govuscourtsca9briefs2771#page/n736/mode/1up
Top Keywords (auto-generated):
press, pslg, prehtr, control, draft, open, notches, inches, hr, temp, reg, oil, hgo, flow, work
Top Key Phrases (auto-generated):
pslg pslg, open inches, prehtr draft, inches open, control press, reg notches, silver gate, press pslg, press oil, valve press, trol press, ter control, routine work, op op, gate routine
Document Status: UGLY